The Krasnodar regional court declared illegal the arrest of the deceived shareholder Vladimir Dorofeev because of the action opposite the regional administration on July 30 and sent the case for review. This is reported by the "Caucasian Knot".
“The regional court figured out what rarely happens - I have a lot of such cases. I defend people who participated in actions in support of Khabarovsk. And there are the same violations, but no one cared about it,” lawyer Aleksey Avanesyan comments.
On July 31, the court of first instance found Dorofeev guilty of organizing an uncoordinated public event (part 2 of article 20.2 of the Code of Administrative Offenses) and arrested him for a day. The police noted in the protocol that the action had to be coordinated with the city hall, since the tent is a prefabricated structure - however, as the lawyer emphasizes, there was no propaganda information on the tent. The meeting that day was held without him.
Avanesyan also noted that his lawyer's warrant disappeared from the materials of the case received from the court of first instance. “I submitted a response from the Ministry of Internal Affairs, which says that there is a warrant in the case. Here is a note in the delivery protocol that the order is attached, and there is a photo of the order. At the same time, there is no warrant in the case, ”the lawyer said.
Vladimir Dorofeev was detained on July 30 in front of the administration building of the Krasnodar Territory in support of the deceived equity holders of the Zhemchuzhina residential complex. Soon he was detained and taken to the police department, where a protocol was drawn up a few hours later. When Aleksey Avanesyan came to the detainee, he was pushed out of the office by an unnamed police officer. a statement in this regard The lawyer wrote .
Several hundred residents of Krasnodar are protesting in connection with the slowdown in the construction of the Zhemchuzhina residential complex. The 17-storey building was supposed to be built no later than 2017, but in 2018 the developer was declared bankrupt, and 630 apartments were unfinished.