About us
Collection
For researchers
Subscribe
Our Telegram
Newsletter
About RIMA
For researchers
Collection
Kronika Project
About us
Collection
For researchers
Subscribe
Our Telegram
Date
12/07/2012
Author
Hidden
Source
7x7 | Gorizontal'naia Rossiia
Preserved copy
Internet Archive
Translated material

The upgrade of the transformers


The capacity of the Chigashevo substation in Yoshkar-Ola after the completion of complex modernization increased one and a half times. The fact that an object with a 43-year history is modernized, residents of the city learned after a summer accident, de-energized part of the residential areas and many industrial enterprises.

The Chigashevo substation

The industrial potential of Yoshkar-Ola will increase by exactly one and a half times-it is precisely the power of the substation in Chigashevo, which supply electricity to mainly industrial enterprises. The press service of the owner of the power farm -the Volga main electrical networks -communicates about the replacement of old equipment with a new one, the introduction of optical -optic communication systems that allow not only monitoring, but also the remote control of the operation of autotransformers. An increase in power by one and a half times opens up new prospects for the development of industry in the capital of Mari El.

The beginning of modernization, if we analyze the information of the regional media, coincided with a large accident on an air line of 110 square meters. On the night of July 4, as a result of emergency shutdown on one of the transformers, due to damage to the high -voltage air line without electricity, there was a river microdistrict with a population of 14,500 people, as well as a number of industrial enterprises.