As promised, I am posting a document that is advisory in nature. As I understand it, the administration, represented by the CAA and city hall officials, was familiarized with this document. But this is not certain.
I am posting part of the report with a drawing:

“When considering the layout plan for the Olympic Avenue highway connecting the street. Shishkova and st. Timiryazev, two rational scenarios arise:
1) the first scenario “Global” - allows for better transport connectivity of the Northern District with the left bank and the central part of the city (the most appropriate option from the point of view of the development of the urban area in the long term);
2) the second scenario “Local” - allows to increase the level of transport accessibility of the territories of the microdistricts “VGFLTU-SKhI” and adjacent territories.”
“Towards the central and left bank parts of the city, correspondence is carried out along Lomonosov and Timiryazev streets. The routing of transport connections in this section was carried out along a path close to the shortest, so the need for residents of the territory under consideration for additional transport connections, including for the future, is minimal . Including the demand for the use of the Olympic Avenue highway according to the 2008 general plan (black dotted line in the diagram) will be minimal, because For the majority of residents of the territory under consideration, driving along this road will lead to overruns, especially in the direction from Moskovsky Prospekt. The need to use the same A/D in routing according to design documentation (yellow dotted line in the diagram) will be close to zero due to the significant distance and significant unproductive overruns .”
“For the future, after 2035, it is planned to develop the agricultural fields of Voronezh State Agrarian University with multi-storey buildings. It is more convenient to carry out the main transport correspondence towards the Northern District, the central and left-bank parts of the city from this territory through the transport interchange near the Northern Bridge (in the diagram these correspondences are marked with blue arrows). The exit to Moskovsky Avenue has limited needs, mainly for cultural and everyday purposes in the direction of shopping centers located in the Northern region; there is almost no labor correspondence in this direction. The main transport correspondence for labor, educational and partially cultural, everyday and recreational purposes is carried out on the street. Lomonosov and Timiryazev (north-south) along its entire length and do not require significant development .”
“It should also be noted that the Northern District, being a large residential area, generates significant transport flows of labor correspondence from its residents. The main volume of such flows is distributed to Moskovsky Prospect towards the center (not considered by us) and towards the Leninsky District and the left bank part of the city. Currently, such transit flows follow the street. Shishkova - st. 45 Page divisions. When tracing the A/D "Olympic Avenue" according to the 2008 general plan, the direction of the correspondence and the route do not coincide, so the redistribution of transit flows will be insignificant, and the bulk of the correspondence will be inter-district: Northern district - microdistricts "VGLTU-SKhI". In the case of routing this A/D according to the design documentation, as can be seen from the diagram, transit flows will receive a straightening of the traffic route, and therefore a significant volume of traffic flow will be redistributed from the street. 45th Page divisions on Olympic Ave. At the same time, the implementation of this decision in the design and estimate documentation is unfinished , since the effective distribution of flows from the transport interchange at the Northern Bridge on Olympic Avenue has not been ensured , and there is also no solution for organizing traffic in the ost area. Birch grove, which is currently experiencing traffic flow difficulties.
In addition, the possible future construction of a new residential microdistrict with high-rise buildings is not a priority in terms of transport demand towards the Northern District due to the insignificance of places of work and study in that part of the city .”
In the case of the implementation of the “Global” scenario, it would be advisable to route Olimpiysky Prospekt along the design estimate, but it should be noted that it is poorly developed in the eastern part of Olimpiysky Prospekt: the issue of transport leaving the street has not been resolved. Lomonosov along the shortest route, there is no solution to improve the transport situation in the ost region. Birch grove. In this scenario, it makes sense to assign the new A/D a II technical category, but it must be a road of citywide importance. In addition, this decision is not aimed at ensuring transport connectivity between the Northern District and the VGLTU-VSAU microdistricts.
In the case of the implementation of the “Local Scenario”, it is advisable to route Olympic Avenue according to the general plan of 2008. In this scenario, assigning a new A/D to the II technical category is impractical due to insignificant traffic flows - a 2-lane roadway and a road category no higher than III is sufficient. This feature is also emphasized by the limited capacity of the street. Dokuchaev from the side of the street. Lomonosov. At the same time, the road is aimed at ensuring inter-district correspondence, and therefore can retain its status of inter-district importance. This solution will ensure the elimination of the long-standing problem of insufficient transport connectivity of the Northern District and the VGLTU-VSAU microdistricts.
Comments . Road category 2 technical category, this is a road with an intensity of 6000 cars per day, we have calculated data for a larger number of cars (twice), 4 lanes, not six lanes and not high-speed, as we have planned.
That is, the increase in the characteristics of a linear object was done with one single point - cutting down the lava, and not providing transport connectivity for citizens and ensuring the development of a comfortable urban environment.