| The Arbitration Court of the Kemerovo Region upheld the security measures in the claim of the Krasnoyarsk Aluminum Smelter against Krasnoyarskenergo and RAO UES of Russia represented by the United Dispatcher Directorate (UDU) of Siberia (located in Kemerovo). These measures are a ban on KrAZ restrictions in the consumption of electricity coming from Krasnoyarskenergo and the Federal Energy Market, and capacities through the ODU. The court itself left KrAZ’s claim against the power engineers “to force” them to fulfill the contract for the supply of electricity without consideration due to the plaintiff’s failure to appear. The ban on restrictions for KrAZ will remain in effect for at least another month, until the court decision “enters into legal force.” According to representatives of Krasnoyarskenergo, power engineers have not yet limited KrAZ in energy consumption. Probably, metallurgists are putting pressure on power engineers through lawsuits and seeking free access to cheap electricity from the Krasnoyarsk hydroelectric station. It, like KrAZ, belongs to the Russian Aluminum holding. Egor NIKOLAEV, Kemerovo |