| Spain and Morocco are planning to dig a tunnel under the Strait of Gibraltar Spanish Prime Minister Jose Maria Aznar, who arrived on a visit to the capital of Morocco, Rabat, invited his neighbors to create a new wonder of the world. Two parallel railway tunnels, which will connect Europe and Africa for the first time in history, are to start at Punta Palomas on the southern tip of the Iberian Peninsula and end at Cape Malabata near Tangier, a Spanish port in Morocco. The length of the entire underground road should be 38.7 kilometers, while almost 28 kilometers of the tunnel will be built under water. The Moroccan authorities agreed to participate in this ambitious “construction of the century” and have already given the green light to begin research work. Over the next three years, Madrid will allocate 27 million euros for this.
The tunnel could have been shorter: at the narrowest point of the strait, Europe is only 14 kilometers away from Africa. However, it is in this place that the strait is very deep, and the tunnel would have to be dug at a depth of more than 900 meters. In the same place where, according to Madrid and Rabat, the future Gibraltar tunnel will pass, miners will have to go only 300 meters below sea level. True, construction will still begin no earlier than 2008: by this time neighboring countries hope to finally agree on all the details.
However, there are still serious doubts that this super project will ever be realized. The announcement of the construction of one of the longest tunnels in the world (and the second longest in Europe after the Channel Tunnel) is purely a PR move. The main purpose of Aznar's visit was to conclude a “truce” with the Kingdom of Morocco. In July 2002, relations between these powers soured over the uninhabited islet of Perejil in the Strait of Gibraltar. Then the Moroccans, in a patriotic impulse, landed troops on this rock, declared their sovereignty over the island, and a couple of days later were extradited from there by Spanish units that arrived in time. Nowadays, there has been a thaw in relations between Madrid and Morocco, and they decided to shelve the “island” problem. And the Spaniards offered Rabat this tunnel as a valuable gift. However, no one can say what will happen to this project when the neighbors quarrel again.
Spain and Morocco have been discussing the idea of building a tunnel under the Strait of Gibraltar for more than 20 years. But the “construction of the century” constantly faces insurmountable obstacles. In addition to the regular quarrels between Madrid and Rabat over Spanish possessions in Africa, there are at least two more problems. Firstly, the construction of tunnels, especially underwater ones, is an extremely expensive entertainment. The 50km Channel Tunnel cost £15bn, requiring special trains to be built and a significant investment in safety systems. Perhaps the Afrotunnel will be cheaper (if only because it is shorter), but in any case, construction costs will be measured in billions of euros.
Morocco most likely does not have that kind of money. Spain is also unlikely to be able to pull off the “construction project of the century” alone. We can only rely on the help of the European Union: just the other day, for example, it agreed to invest 62 billion euros in the transport infrastructure of a united Europe. However, the Gibraltar wonder of the world is not yet on the list of projects in which these billions will be invested. Moreover, the EU has other tunnels that constantly require money, for example, trans-Alpine highways.
In addition, the Gibraltar tunnel will inevitably face the problem of recoupment. Despite the fact that tens of thousands of people travel from Britain to continental Europe and back every day, and tons of goods are transported, the Channel Tunnel did not immediately become profitable, and in 1996 it almost went bankrupt. But Morocco is far from Great Britain, and the tunnel cannot be filled with the import of oranges to Europe and tourists alone. Therefore, it is hard to believe that the future “underwater road” will ever begin to pay off.
The Afrotunnel could also pose a serious problem for Spanish border guards. Over the past few years, Madrid has diligently fenced itself off from illegal emigrants from Morocco and has created a special electronic system that tracks boats with border violators at sea. If there is a tunnel, a new, much more convenient route to the Iberian Peninsula will open for illegal immigrants. This problem is well known to Great Britain: border guards there regularly catch suspicious persons trying to enter Albion through the Eurotunnel.
PHOTO: Just to “shed light” on the technical side of the project, 27 million euros will be required Vladimir DZAGUTO |
|