The city hall summed up the results of the two-month improvement campaign.
During this time, 29.5 thousand square meters were renovated. meters of building facades (including 13.1 thousand square meters in the Kirovsky district); 239 excavations were restored; 25 container sites were built; 117 children's and sports grounds were renovated; 253 benches for rest were installed; 139 sandboxes have been equipped, most of which (84) are in the Oktyabrsky district.
As part of community cleanups and “sanitary Fridays,” 10.5 thousand trees were whitewashed, more than 3 thousand trees and shrubs were planted, and over a thousand were demolished or pruned.