
The ship "Mikhail Dudin" with the next load of uranium tails came out of Amsterdam to Russia to deliver them to Ust-Luga in the Leningrad Region, from where they will be sent by train to Novouralsk. This was announced by the Greenpeace of Russia.
From May 2019 to the end of August 2020, 18 parties of 600 tons of Uranium tails were transported from the Urenco plant to Russia (Germany) to Russia, only 10,800 tons. On June 30, 2020, another 17,000 tons were stored at the plant in Gronu. The final point for the "tails" is the Ural Electrochemical Plant in the city of Novouralsk (Sverdlovsk Region), where they are stored in open -air containers.
The Rosatom, whose subsidiary is accepted by the impoverished HEON HENO HEON, claims that the “tails” will process and Russia will sell Germany Uranus-235, and the Russian state corporation wants to use the residues as fuel in fast neutron reactors, which are planned to be built in a few decades.
Since 2019, Russian and foreign activists have been protesting against the import of uranium tails into Russia. At the end of last year, the public organization "Eco -Protection!" And the Russian branch of Greenpeace handed over to the German authorities a petition against the import into Russia of German nuclear waste with signatures of more than 70 thousand Russians. In more than 20 cities, protests were held. In mid -June, 47 public organizations and deputies of regional and municipal parliaments from Russia, Germany and Holland turned to the heads of Germany and Russia with a request to stop transporting radioactive waste to Russia.
Wed to Yandex.Zen CR on Instagram SR in Telegram