Laying tiles is a complex and labor-intensive process that requires not only preliminary calculations, but also a certain skill. That is why this type of construction work is one of the most expensive, and the tiler profession is one of the most respected in this area.
Let's start with the fact that tiles come in different types: from simple paving or facade tiles to complex decorative ones, for example, for baths or kitchens. The action plan in the process of implementing the planned apartment renovation depends on the type of work and the choice of tiles. Most often this is the working side of the interior of the kitchen, bathroom , toilet, or simply the floor covering in the room. To save money, you can design or decorate your home with tiles yourself. What is needed for this?
- Tile cutter or glass cutter. The second one quickly becomes dull, so if you have the opportunity to use the first one, you will significantly speed up and simplify the work process. For ceramic tiles, a hacksaw with a cutting blade is useful.
- A tape measure is necessary for marking the room. It can be replaced by a long ruler, but only if the installation perimeter is small. You will also need chalk and a pencil for calculations.
- Toothed and rubber spatulas. Needed to wash away the glue and rub the grout into the seams between the tiles.
- Straight wooden blocks or level. Such tools are mandatory in this difficult task. They help avoid unevenness. If you are placing material on a wall, you can use a tool such as a plumb line. But for the correct and high-quality design of corner joints, a corner is useful.
- Container for mixing the solution. Ideally, a bucket of at least 5 liters.
- A sharpening stone is needed to remove sharp corners on the tiles.
- Special pliers are needed to make holes in the material.
- Unnecessary rags, a toothbrush or a rubber eraser are often used to rub out seams.
- Crosses, so that the distance between the tiles is the same.
- Grout. A solution that helps not only hide cement, but also eliminate moisture ingress.
- Glue. A separate type of adhesive is used for all surfaces and rooms, so consult with a specialist before spending money on a material that may not be useful or will not hold the tiles, which is much worse.
- And of course tiles! Where would we be without her?
When the tools and materials are ready, we get to work. First, let's take a closer look at our room. The walls and floor at the installation site must be level. All imperfections should be puttied in advance. After fixing cracks and potholes, you need to wait until the plaster dries. It is advisable to wipe it with a damp sponge. Next, measure the surface on which we will lay the tiles.
When making markings, do not forget that approximately 10% of the material is consumed when cutting and decorating window openings, window sills or other small areas. If you use tiles as a floor covering, then it is better to start laying from the most noticeable corner in the room. Apply the adhesive evenly to the tiles and the supporting surface.
A trowel-comb will reduce to a minimum the area of the mortar that comes into contact with the tile. Only after the work on the floor is completed can you begin to work on the walls. The base row of tiles is one of the most important. We leave it empty, fencing it with a special rail.
Next, the side spaces of the room are decorated with material. Periodically use a level to check that the installation is even. Slopes and corners must be glued at the very end, just like the bottom row of the basement. We immediately remove the remaining solution, otherwise it will quickly harden. Apply grout to the joints only after the glue has completely dried.
We hope that these simple rules will help you decorate your room with tiles yourself, and also save you from problems during the work process.