
On Sunday, on Sunday, a ceremony of withdrawal from the workshop of the Yuri Dolgoruky atomic nuclear submarine took place.
The ceremony was attended by First Deputy Prime Minister Sergei Ivanov, the Commander-in-Chief of the Navy Vladimir Masorin, Deputy Minister of Defense Alexei Moscow, adviser to the President of the Russian Federation for military-industrial policy Alexander Burutin, Moscow Mayor Yuri Luzhkov, general director of Sevmash Vladimir Pastukhov, head of the Arkhangelsk Region administration Nikolai Kiselev.
After setting the subsidiary to the complementary embankment, the stage of mooring tests will begin, which is planned to be completed in October 2007.
After that, the stage of factory running tests will begin. Currently, the technical readiness of the Premier League is 82%.
In 2007, as part of the state defense order for the development of the project, 742 million rubles will be allocated, 4.92 billion rubles for the construction of the ship. The Yuri Dolgoruky Premier League, Project 955, such as "Borea", has been built on Sevmash since 1996.
It is planned that the ship will be equipped with a Bulava-M strategic missile system with individual guidance nuclear blocks, capable of hitting targets at a distance of up to 8 thousand kilometers. The length of the case of the Premier League is 170 meters, the width is 13.5 meters.
In addition to ballistic missiles, the submarine will be equipped with torpedoes. The nuclear power plant, which drives one rowing screw, will allow the boat to develop speed in the surface position of up to 15 knots, and in an underwater position to 29 knots.
The Commander -in -Chief of the Russian Navy Admiral Fleet Vladimir Masorin, the day before, said in an interview that Yuri Dolgoruky would be transferred to the fleet after testing in 2008.