I return to the topic of my previous post ( http://stepanyukv.livejournal.com/20859.html ). And so, yesterday we returned to Barnaul and now we can say more objectively that the problem of building a hydroelectric power station is really serious. A group of specialists and I toured the entire Multa valley, talked with an initiative group of fighters for the preservation of the valley, and talked with representatives of local tourism businesses and farms. During our visit, I came across a lot of materials: films, articles in local newspapers, and comments from specialists.
All these materials only helped me to confirm the absurdity of this construction. The proposed hydroelectric power station projects are very similar to a fairy tale, this is especially noticeable when you transfer them to the locality in real life. The Multa River is a small river that almost completely freezes over in winter, as we were able to verify personally. Already now, the water level in it barely reaches 15-20 cm. And if you read the official publications of Altai Generating Company CJSC - this is the company that ordered the hydroelectric power station, it becomes generally interesting how they are going to “remove” 34.5 MW of electricity from Multa. Where will they get it?
However, as I am not knowledgeable about this, I cannot give any arguments. But there are also comments from experts:
[ Article by Senior Researcher of the Russian Academy of Sciences G.G. Ushakova ]
We helped the initiative group create a blog of their opposition, multozera, in which they will publish all the latest news and appeal to the public for help.
They also independently conduct their activities on the following resources:
http://democrator.ru/problem/7517 - documents, administration responses, articles and signature collections.
http://vk.com/club22659042 - a group of supporters of the preservation of the Multinskaya Valley
Activists also filmed a series of videos, which can be viewed on this YOUTUBE channel http://www.youtube.com/user/gahhrude