Date04/12/2013AuthorHiddenSourceRBCPreserved copyInternet ArchiveTranslated materialShow originalThe number of workers at the construction site of the Zenit Arena stadium is being doubled.Our archive does not currently contain the full version of this documentWhere to read:Preserved copyLink to original version