
2 new applications for road repair in the Ukhtinsky district:
1. Repair of the entrance to the village of Vodny - section 500m, 5.068 million,
2. Repair of the entrance to the Schudayag village - section 460m, 5.13 million.
It is noteworthy, but in fact, repairs to the amount that it is not registered there is not required ( read the site U24 , and I asked my friends who are constantly driving along these roads), i.e. The entrance to the water in satisfactory condition, but the roads of the water in the bad, why not repair them first? On the way to Shudayag, on this site, there are also a couple of problem areas and that’s all, it is not clear why there is a continuous asphalting of a short site. Here it was possible to do with a pitched repair and save money, or make a moisture repair of the entire road.