
A day after snowfall in the south of Primorye, which brought a three -month rainfall, traveling on a number of regional and city roads is difficult. Work on cleaning the tracks is going on around the clock: in some places, snowdrobs up to four meters heighted by the wind.
“In some sections of roads, the height of the snow flooring reached a meter -free -free floor, and as a result of strong winds reached four meters. From 170 to 250 units of equipment, the director of the Department of Transport and Roads of Primorsky Territory, Alexander Shvura (quote for Interfax” ), said to clean the roads.
The primary task, which was set by the regional road enterprise Primavtodor, was to ensure the passage of vehicles. According to the assessment, by the morning of Thursday, the passage, albeit difficult in some places, is provided.
According to the authorities, a movement in the Terney region remains complicated, a whale rib on the pass. There are problems with ensuring travel in the Khasansky district, in the Ussuri and Dalnegorsky urban districts. But the situation in the territories is under control, the necessary work is being underway there.
According to the existing standard for cleaning roads after precipitation, 72 hours are provided, the official recalled. “So far, only the first day has passed, so the cleaning of roads and bus stops continues. All the equipment works around the clock and will work until the roads are completely cleaned from snow. We carry out constant monitoring of the road situation,” the School said.
On January 18-19, the Primorsky Territory was in the zone of action of a powerful snow cyclone. In some areas, three menstruation norms of snow fell. To the capital of the region - Vladivostok - a monthly rainfall has collapsed.