Date03/23/2016AuthorВедомостиSourceVedomostiPreserved copyInternet ArchiveTranslated materialShow originalThe incident with the Turkish dry cargo ship will not affect the construction timeline for the bridge to CrimeaOur archive does not currently contain the full version of this documentWhere to read:Preserved copyLink to original version