
"Rosgeology", responsible for the elimination of waste of the Baikal Pulp and Drummer Plant, plans to open the production of sluts-lignin on the shore of Irkutsk near the village of Mota. This was reported by the villagers at a recent gathering, expressing a protest against the project.
The plant was closed in 2013, leaving 6.5 million tons of waste in storage cards, mainly slutting lignin. The executor of the project to eliminate these waste-Irkutskgeophysics (is part of the Rosgeology holding)-the largest industrial landfill in Lake Baikal plans, according to local residents, to create a production of sluts in more than one hundred kilometers from the BCC-near the Shelekhov village of Mota on the banks of the Irkuta River, where Rosgeology is He owns a plot of 240 hectares. In May, the top managers of the holding turned to the Shaman administration with a request to transfer the land of agricultural recognition to the industrial category. On the eve of the village there was a gathering, to which residents of the nearest villages and the Shelekhov district center arrived - residents categorically against the launch of the producing production in the water protection zone.
SR in mobile SR on Instagram Wed FacebookThe initiative group has already collected more than 500 signatures against the plans of Irkutskgeophysics, sending appeals to the governor of the Irkutsk region, deputies and direct line of Russian President Vladimir Putin. The mayor of the Shelekhovsky district, Maxim Modin, also announced that the district administration of the Rosgeology is considered "unacceptable."
The Deputy Minister of Natural Resources and Ecology of the Angara region Yevgeny Bichinov commented that in general, the contractor is considering 3 probable places for reclamation of waste - an industrial zone in Baikalsk, a landfill of household waste in Slyudyanka and the village of Mota. In response to the commentary of the regional official, the villagers ask why to launch the process of changing the category of land on the site under the mots, if the decision has not yet been finally made.
The press service of the "Rosgeology" of the editorial office of Siberia. Reali said that the site for production has not yet been chosen, since the customer-manner of natural resources of the Irkutsk region has not yet approved the project itself. According to the official representative of Rosgeology, Anton Sergeyev, at the meetings of the Governor of Priangarya and the head of the Ministry of Natural Resources, it was decided to adjust the existing project: “Now we are waiting for the customer to submit an additional agreement to the contract and the technical assignment to adjust the Rosgeology, preparatory work has been carried out, namely, the organization of the production network has begun, the delivery of the stoves were identified, the stoves were identified, crushed stone and other materials for creating working infrastructure at the facility. "