About us
Collection
For researchers
Subscribe
Our Telegram
Newsletter
About RIMA
For researchers
Collection
Kronika Project
About us
Collection
For researchers
Subscribe
Our Telegram
Date
07/22/2019
Author
Cибирь Реалии
Source
Siberia.Realities
Preserved copy
Internet Archive
Translated material

Magadan design a cultural center for 3 billion rubles

Magadan, the view of the city

The federal state institution "Directorate for Construction and Reconstruction" announced the purchase of a cultural center for designing a cultural center in Magadan. The price of the project to create a project begins with 14.9 million rubles, the cost of the center itself is planned at the level of 3 billion rubles, according to the public procurement website.

According to the presentation of the integrated development of Magadan, published on the website of the Urban Planning Department, the cultural center will be located behind the cathedral on the site of the ski -regional route. The complex itself will include, according to the technical documentation of the project, two halls, a club and film lecture, as well as halls for classes of choral groups and orchestras, premises for craft and creative workshops and exhibition "hall-transformer". The preliminary cost of construction will be 3.2 billion rubles.

SR in mobile SR on Instagram Wed Facebook

Now the city is working to remove the site for the construction of the facility. However, the inhabitants of Magadan themselves believe that the city does not need such an expensive building, the population of which is 91 thousand people, writes Vesma.tude.

Whether a huge center of 3 billion is needed for a 90,000th Magadan-a question seems to be solved by local officials.

Wed on YouTube Wed to Yandex.Zen