
On the "running" passengers again noticed a leak. The Metrostroy said that this is a regular situation that arose as a result of repair work.
An eyewitness in the group “Recognizes of the accident and emergency” reported the water arising from the joint on the wall. In Metrostroy, which conducts repair at the repair station, the “St. Petersburg diary” was told that the day before, a waterproofing solution was being prepared there at night for decoration in a pedestrian crossing. For this, the workers have expanded the deformation seam, which led to the leak.
The leaks will be eliminated during the work the next night, added to Metrostroy.
Repair work at the Begovoy and Novokrestovskaya (renamed Zenit) began in February - “Metrostroy” changes tiles there and eliminates leaks. Read our text about how the townspeople from the very opening of two stations complained about their finish, leaks and breakdowns of equipment.