Muscovites it's time to wean to wash
In the capital, traditional summer preventive shutdowns of hot water begins. Until the end of May, warm water will disappear in more than 19 thousand buildings. These are not only residential buildings, but also schools, hospitals, shops, administrative buildings. Until September 1, preventive shutdowns will cover almost all of Moscow. The exception will be only a few new areas where they will not be required, thanks to the modern polyurethane foam pipes, which do not need an annual check.