At the Fukushima-1 NPP, a radioactive water cleaning system is again stopped due to problems
The radactive water system at the Fukushima-1 NPP, once again launched the day before , was again stopped due to technical problems, the Tokyo Electric Power Corporation (Tepco), which is the station operator, said on Wednesday. During the inspection of the network of connecting pipes with a total length of one and a half kilometers, experts found two small cracks in one of the sections from which water flows.