September 17, 2013 in the Primorsky district of St. Petersburg took place the third rally of opponents of the construction of the church in the square on Dolgoozernaya Street. The event was attended by several dozen people, a gathering was organized signatures. According to one of the rally organizers, the number of signatures collected close to three thousand.
Remember September 12th 2013, was organized a collection of signatures for the construction on Nevsky Prospekt temple. Opponents of the construction went to court, pointing out the lack of necessary documents, but work on the site was not stopped.
Sources