
From 6:00 on October 14 to 04:00 on October 15 in 46 residential buildings of the city of Vladimir, 2 educational institutions, 4 medical organizations and 15 administrative buildings, including the White House, heating heating. This was reported by the press service of the resource-supplying company T Plus.
This measure is associated with the need to install 5 systems for accounting for the state of the pipeline on Oktyabrsky Prospekt. In the future, this will quickly find and eliminate damage to pipelines. Work on the installation of the units of metering of the heating systems will be performed by the Vladimir branch of “T Plus”.
Heating will be turned off to the following addresses: